<nav id="akmoo"><em id="akmoo"></em></nav>
  • <button id="akmoo"><optgroup id="akmoo"></optgroup></button>
  • <del id="akmoo"><tr id="akmoo"></tr></del>
    <samp id="akmoo"><acronym id="akmoo"></acronym></samp>
    Architectural engineering
    Changle people's Hospital

     
    The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
    The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
     
    Won the 2012 Weifang construction site comprehensive management model project award.
     
    日韩中文字幕久久精品,九九色视频,九九久久亚洲综合久久久,女人被狂C躁到高潮视频免费