<nav id="akmoo"><em id="akmoo"></em></nav>
  • <button id="akmoo"><optgroup id="akmoo"></optgroup></button>
  • <del id="akmoo"><tr id="akmoo"></tr></del>
    <samp id="akmoo"><acronym id="akmoo"></acronym></samp>
    Municipal and highway engineering
    Yuhe bridge, Chongwen street, Weifang City
    Yuhe bridge, Chongwen street, Weifang City, is located on the east side of Beihai Road. It is a reinforced concrete hollow arch bridge with a net span of 40m and a total bridge deck width of 22m. The cross section is arranged as 3M sidewalk + 16m motorway + 3M sidewalk, with a design life of 100 years and a seismic intensity of 7 degrees. C40 and C30 concrete are used for the main body, 4cmac-13 fine-grained modified asphalt concrete + 6cmac-20 modified asphalt concrete are used for the pavement of the carriageway, cherry red granite fire plate is used for the pavement of the sidewalk, and mirror cherry red granite is used for the kerb. Won the 2015 Shandong municipal gold cup demonstration project award.
    日韩中文字幕久久精品,九九色视频,九九久久亚洲综合久久久,女人被狂C躁到高潮视频免费